Daily Maintenance and Replacement of Roots Pump of Oil Filter

2019/8/1??????view:

  1. Regular inspection

  1.1. Daily check:

  (1) Oil level check: check the oil level of gear box and bearing box, too much oil level of gear box and bearing box, oil temperature will rise; too low oil level will cause poor lubrication of gears and bearings.

  (2) Temperature Check: Check the temperature of each part with a thermometer.

  (3) Motor load inspection: measuring motor load with power meter or current and voltmeter.

  1.2, monthly check: tension of coupling elastomer or triangular tape.

  1.3, quarterly inspection; Whether the lubricating oil in the gearbox is deteriorated or not.

  1.4. Semi-annual inspection:

  (1) Whether the lubricating oil in the bearing box of the front cover deteriorates.

  (2) Whether the mechanical seal is damaged or not.

  1.5. Check every year:

  (1) Whether the bearing is worn or not.

  (2) Whether the piston ring and piston ring bushing are worn or not.

  (3) Whether the micro-wear of gears has an effect on the normal operation of the rotor needs to be adjusted.

  2. Attentions for disassembly and assembly: Roots vacuum pump should be disassembled and reassembled according to the following precautions:

  2.1 Before disassembly, the clearances of the main and driven rotor parts must be measured and recorded.

  2.2. When disassembling, it is necessary to avoid hammering parts directly with heavy hammer. The disassembled parts should not be bruised, and should be cleaned and properly kept.

  2.3. The reasons and circumstances for the replacement of the parts to be replaced are recorded in detail.

  2.4 Before reassembly, all assembly parts must be burred and cleaned.

  2.5. The static sealing plane without gasket or sealing ring is sealed with "106" silicone rubber coating. The rubber seals used for static sealing can be coated with vacuum grease.

  2.6 The clearance of the main and driven rotors can be adjusted according to the clearance before the dismantling of the pump.

  2.7. Leakage test must be carried out after all are installed.

  2.8. After reinstallation, commissioning and necessary performance testing should be carried out before normal operation.

  3. Pump disassembly steps:

  Before removing the pump, drain the accumulated water in the pump and lubricating oil in the tank and cut off the main power supply.

  3.1. Remove the fixed end:

  1) Loosen the fastener between the motor and the motor connecting frame, then unload, refuel plug, lower motor and motor connecting frame.

  2) Remove the shaft seal (mechanical seal) pressure cap, the oil retaining disc, the garden nut and the shaft seal pressure cap.

  3) Remove the seals of the mechanical seals; (Replace the piston ring seats of the mechanical seals and install the new active shaft of the mechanical seals after 1-3 steps. );

  4) Remove the front cover; (Replace the whole set of mechanical seals, after completing 1-4 steps of piston ring, install new mechanical seals. ) Balanced mechanical seals

  5) Loosen the round nut and oil disc for the shaft; Bearing cap and ball bearing.

  6) Remove bearing cap; front cap, front cap and drain plug.

  7) Remove the bearing cap and bearing from the end cap (replace the bearing).

  Press out protective sleeve;

  Pull out the rotor and dismantle the pump.

  If Roots vacuum pump with bypass valve is used, the pressure cap of bypass valve should be removed, the valve head of bypass valve should be taken out, and the movement of the guide sleeve and the hole of the valve head should be checked for flexibility and reliability of the sealing ring.

  4. Pump loading steps:

  Before loading the pump, all parts should be cleaned and burrs removed. Attention should be paid to the sealing surface should not be oiled.

  1) Put a pair of rotors into the pump body, pay attention to the position of the long and short axis rotors, and insert a plug ruler in this position.

  2) Apply a thin layer of 106 silicone rubber evenly on the contact plane between the end cap and the pump body at both ends, and tighten the screws.

  3) Install piston ring and piston ring bushing and oil shield, and adjust the schematic diagram of rotor clearance.

  Install bearing seat, bearing and bearing locking nut and bearing pressure cap (the original removal adjustment gasket is placed in place under the fixed end bearing seat, and the bearing seat is fastened);

  Silicone rubber and tighten the front cover;

  Roots vacuum pump with bypass valve shall be equipped with relief valve head and pressure cap.

  After installing the mechanical seal cap, the coupling is installed on the active shaft. The manual disc-driven coupling should rotate flexibly and not be stuck. Finally, the motor connecting frame and motor are installed. If it is possible to test the air tightness of the pump, the dry air of 0.2-0.3 MPa can be injected into the pump, and soap liquid is applied on the sealing surfaces to check whether there is air leakage. After installing the oil discharging bolts, the pump is refuelled, and the oil level is generally about 3/4 of the oil window. Connect the power cord, the water pipe and the air inlet cap of the pump. Start the pump, pay attention to steering, if necessary, test the performance of the pump.


女浴室里赤裸裸洗澡丰满视频| 精品人妻少妇嫩草AV无码专区| 久久久久久久99精品免费观看| 波多野结衣52部合集在线观看 | 一尘网中国投资资讯网| 亚洲 自拍 另类小说综合图区| 亚洲日产韩国一二三四区| av无码人妻中文字幕| 成人小说亚洲一区二区三区| 国产精品大白屁股XXXXX| av无码免费播放| 房东天天吃我奶躁我| 香港aa三级久久三级| 日本无码成人片在线观看波多| 被两个按摩师用春药按摩| 黑色丝袜秘书夹住巨龙摩擦| 男女做爰吃奶猛烈叫床视频电影| 精品国产污污免费网站入口 | 成人无码A片一区二区三区免费看| 性欧美大战久久久久久久黑人| 精品一区二区三区免费毛片W| 无码成人性爽xo视频在线观看| 美女与野兽图片真人唯美| 成人免费区一区二区三区| 四虎国产精品永久地址| 亚洲精品成人网站在线观看| 国产精品视频一区| 美国十次狠狠色综合av| 年轻的母亲 韩国| 午夜dj在线观看免费视频| 野花直播视频免费高清完整版| 国精品无码一区二区三区在线蜜桃 | 拧花蒂尿用力按凸起喷水尿| 精品国产一区二区三区av性色| 国产精品久久欧美久久一区| 18禁黄网站禁片免费观看不卡| 耽肉高H喷汁呻吟体育生| 在线成人WWW免费观看视频 | 和子发生了性关系的免费视频| 欧美日韩国产| 人妻少妇偷人精品无码洋洋av|