Maintenance and Replacement of Electromagnetic Valve of Vacuum Oil Filter

2019/8/1??????view:

  Maintenance of the solenoid valve of the vacuum oil filter. This component is mounted on the pump. Its air ballast is driven by the solenoid valve for 24VDC.

  When the air ballast valve is opened and operates at normal temperature, SOGEVAC's capacity of pumping steam can reach the maximum water vapor resistance in the technical parameters for pure water vapor. When the working temperature rises, the vapor limit of the pump also increases.

  Open the air ballast valve with a single screw batch. When the ballast valve is opened, the noise of the pump increases slightly. Before the pump is ready to extract steam, the air ballast valve must be opened under the closure of the intake port, and the pump will run for about 30 minutes to preheat.

  Important Notes

  Only when the pump is preheated to the working temperature can the inlet valve be opened to extract condensable steam, because the process gas pumped by the cold pump will condensate the steam into the oil.

  In the process of high content condensing steam evacuation, the intake pipe should be opened slowly after the working temperature is reached to prevent excessive steam from entering the pump.

  One of the phenomena of steam condensation in pumps is the increase of oil level during pump operation.

  During the evacuation process, the steam can be dissolved in the oil. This will change the characteristics of oil and cause pump corrosion. Therefore, do not stop the pump immediately after the end of the pumping process. Instead, the intake pipeline is closed to allow the pump to continue operating under the open air ballast until there is no condensate gas in the oil. We recommend that it should run in this way for about 30 minutes after the end of the evacuation process.

  Be careful:

  In the process of cyclic evacuation, do not stop the pump during the gap between the two evacuation processes, but should close the intake port, perhaps through the valve to achieve. Open the ballast valve to keep it running.

  When the pump operates under the limit pressure, the power consumption is very small.

  Once all the steam is removed from the process (e.g. vacuum drying), the air ballast valve can be closed to improve the limit pressure.

  Cyclic work

  We emphasize that to limit the number of pump start-ups, it should be 5 or 6 times per hour.

  If the process requires periodic operation, we recommend the use of pneumatic solenoid valve control, so that the pump works continuously.

  In general, the pump should be stopped after all the work is completed.

  The inlet of SOGEVAC is equipped with an anti-return oil valve. When the pump is powered off, it closes the inlet, thus keeping the connected system vacuum and preventing oil from returning to the system. Gas ballast does not hinder the function of the valve.

  When the condensable medium is exhausted, the air ballast valve should be opened before the pump is powered off, and the intake pipe should be closed to allow the pump to continue to operate (see Section 2.5.2).

  warning

  If the pump has to be stopped for a long time or if it has to be stored, please follow the following steps.

  When evacuating harmful substances, appropriate safety measures should be taken.

  Fill in clean oil to the lower edge of the oil level observation window and let the pump run for a few minutes.

  Then the oil is released, and the clean oil is poured into the upper edge of the oil level observation window.

  Close the connection. No anti-corrosion oil is required.

  warning

  When the pump is powered off due to overheating caused by the motor or its temperature detector, the pump must be cooled to the ambient temperature and the cause of overheating can be eliminated before starting manually again.

  After power failure, in order to prevent accidental start of the pump, the pump must be connected with a control system so that it can only be started by manual switch. This is also applicable to emergency circuit breakers.

  If switching the process related to the preheated pump under working conditions, remember that the pump can not be started directly again.

  Limit pump pressure

  If the system can not meet the pressure specified in the technical data, the pump will be removed from the system and the limit pressure will be measured directly at the pump suction port.

  The limit pressure (air partial pressure) of non-condensable gases can only be measured with a compressed vacuum gauge or a pressure gauge. Accurate measurement data can only be obtained with calibrated instruments.

  When the pump is first started after a long period of idleness or oil replacement, it will take some time to reach the prescribed limit pressure. Because the pump must reach its working temperature, the pump oil must be degassed. We recommend opening the air ballast valve for the first start-up pump.

  Limit pressure depends on pump temperature and the pump oil used. Using the recommended oil, the best limit pressure can be obtained at low pump temperature.


少妇无码太爽了不卡视频在线看| 日本免费一区二区| 阿娇跪下吃j8图片| 一本色道久久综合亚洲精品蜜桃冫| 特发性震颤是什么病| 丰满少妇在线观看网站| 国产又色又爽又黄又刺激视频国语 | 亚洲综合无码精品一区二区三区| 色欲AV亚洲波多野结衣| 久久人午夜亚洲精品无码区| 变态另类玩孕妇临盆| 日本娇小XXXⅩHD| 最近免费观看高清韩国日本大全 | 欧美人与动牲交片免费| 久久久久久精品免费看sss| 奇米777四色影视在线看| 在厨房被c到高潮a毛片奶水| 久久久亚洲欧洲日产国产成人无码| 和白嫩风韵少妇国语露脸十五分钟| 色戒汤唯电影无删减版梁朝伟| 办公室揉弄震动嗯~动态图| 国内精品乱码卡一卡2卡三卡| 免费观看又色又爽又黄的小说 | 国产真人毛片爱做A级毛| 国产做A爱免费视频在线观看| 日本免费一区二区三区视频观看| 精跪趴灌满白浊共妻NP老师学生 | 中文字幕乱偷无码AV先锋| 锕锕锕锕锕锕锕好大污下载| 精品人妻无码一区二区三区牛牛| 精品少妇AV无码免费久久洗澡| 无码精品A∨在线观看中文| 三上悠亚ssni绝顶を教え込ま| juliaann精品艳妇| 国产乱XXXXX97国语对白| 娇妻销魂的交换经历| 桥矿影视超棒第1集| 国产午夜精品一区二区三区不卡| 息与子猛烈交尾在线播放| 久久精品国产精品亚洲色婷婷| 亚洲 欧美 日韩 精品 自拍|