国产a一级毛片视频国语,亚洲欧美久久精品18禁,一区二区日本一区二区欧美,在线观看性感天花板插b

Your Position: Home > Support > Service Center

Notes for reuse of Lyboa pump of ZYD transformer oil filter

2019/8/1??????view:

  The pump must be stored in a dry place before it returns to the workplace again. Better at room temperature (200C). Before the pump is withdrawn from the workplace, it should be removed from the vacuum system, washed with dry nitrogen and replaced with oil. The inlet and outlet of the pump must be sealed with the shipping seals at the time of delivery. The gas town must be closed. If the pump is idle for a long time, it should be sealed with plastic bags and desiccant.

  If the pump has been idle for more than a year, it must be maintained in a standard way and oil must be changed before the pump is put into operation again. We recommend that you contact the LEYBOLD manufacturer for maintenance services.

  Standard pumps are not suitable for installation in explosive dangerous areas. Please contact us when you intend to apply this method. Before installing the pump, it must be reliably disconnected from the power supply in order to prevent accidental start-up of the pump. Pumps can only be installed by qualified and well trained personnel. All safety regulations should be observed.

  Installation of ZYD oil filter Lyboa pump for reuse:

  In order to ensure safe start-up, it is necessary to proceed step by step according to the following instructions.

  The start-up can only be carried out by trained full-time personnel.

  SOGEVAC can be installed on any flat, horizontal plane. Under the four legs, there are metric threaded holes for fixing pumps.

  If the pump is inclined, the oil level can not be correctly read out. The pump is in danger of running dry.

  According to the different use of oil, the ambient temperature of the pump should be between 12 (55) and 40 (104). By improving the pump or replacing different types of oil, the pump can operate at lower ambient temperature. Please consult us about these questions.

  In order to ensure a good cooling of the pump, there should be enough space in the intake and exhaust outlets for maintenance and repair. Make sure the motor air intake is clean and clean.

  1. Connect to the system

  Standard pumps are not suitable for installation in explosive dangerous areas. When you plan to do so, please consult us. Before installing the pump, it must be reliably cut off from the power supply to prevent unintentional starting of the pump. The pump can only be installed by qualified and trained professionals.

  Comply with all safety regulations.

  2. Inlet side

  The intake flange of the pump is connected by internal threads. The pump can be connected to the vacuum system with suitable connectors.

  The cross section of the intake pipe should be at least the same as that of the intake port. If the intake pipe diameter is too small, the pumping speed will be reduced.

  We recommend using LOCTITE or TEFLON tape for threaded joints to ensure vacuum sealing. (especially when dangerous gases)

  3. Installation Warning of ZYD Oil Filter Lyboa Pump

  The pump should be connected to the intake pipe without any stress. Hose or pipe fittings are used in intake and exhaust pipes for easy removal during pump maintenance.

  - The maximum import pressure shall not exceed atmospheric pressure (about 1013 mbar). When there is excessive pressure in the import, the pump shall not be started.

  - The type of material used in the installation of pipes should take into account the type of gas pumped. The same is true for seals.

  If the process gas contains dust, dust filters must be installed in addition to random dust filters. We recommend that dust filters be installed horizontally with tees (3/13) or elbows (3/14). This ensures that no dust particles fall into the intake when the filter is removed. Import filters with different filter elements. Metal filter can prevent solid particles such as paper and plastics from entering the pump; paper filter can remove small particles such as dust and powder less than 1 micron; activated carbon filter can absorb chemical vapor such as acid and solvent. If the activated carbon filter is stored in a humid place, it should be dried at 212 for 2 hours before use.

  When extracting steam, we recommend installing condensers at the inlet and outlet sides.

  When pumping dangerous gas, the intake pipe must be tight.

  Solid particles or liquids are never allowed to enter the pump.


被全村灌满精的雯雯| 亚洲熟妇色XXXXX亚洲| 好大好湿好硬顶到了好爽视频| 亚洲中久无码永久在线观看同| 久碰人妻人妻人妻人人掠| 寡妇大J8又粗又大| jizzjizz日本高潮喷水| 挺进同学熟妇的身体| 国精产品W灬源码网站1688| 亚洲成A人无码亚洲成AV无码 | 男人扒开添女人下部免费视频| 中文字幕乱码亚洲∧V日本1| 中国妇被黑人xxx猛交| 亚洲 都市 校园 激情 另类| 成人网站WWW污污污网站| 性XXXX荷兰HD| 老板把我抱到办公室揉我胸视频 | 又爆又大又粗又硬又黄的A片 | 体育生小鲜肉勃起VIDEOS| 久热国产精品视频一区二区三区| 少妇高潮惨叫久久久久电影69| 成在线人av免费无码高潮喷水| 免费男人脱女人的裤衩和奶罩| 国产做A爰片久久毛片A片| 欧美激情xxxx性bbbb| b站禁止转播404入口| 国产精品无码午夜福利| 丰满少妇作爱视频免费观看 | 欧美熟妇另娄久久久久久 | 极品尤物一区二区三区| 欧美大肥婆大肥bbbbb| 成人做爰免费视频免费看| 女人一晚上高潮十几次| 亚洲精品国产SUV一区88| 无码精品a∨在线观看中文| 播放男人添女人下边视频| 小13箩利洗澡无码视频网站| 大胆人体艺术摄影| 女仆乖乖脱内衣内裤打屁股| 银杏视频在线观看www| 放荡的护士HD在线观看|