国产a一级毛片视频国语,亚洲欧美久久精品18禁,一区二区日本一区二区欧美,在线观看性感天花板插b

Your Position: Home > News > Activities

Installation and Daily Maintenance of Roots Pump of Oil Filter

2019/8/1??????view:

  In the operation, hoisting, installation, use and maintenance of equipment, the correct processing procedures must be strictly followed.

  Once improperly operated, the internal or external transmission parts and driving equipment of the pump may also cause serious damage to the human body. It is strictly forbidden to start the vacuum pump when the intake cover or exhaust cover of the pump and the refueling and discharging ports are dismantled. If we want to check or maintain the moving parts of the pump, we must first completely cut off and lock the control power equipment.

  Higher temperature on the surface of roots pump housing and connecting pipes and accessories may cause injury when human body contacts.

  1.Dismantling and hoisting

  1.If the pump is packed in wooden cases, care should be taken not to touch the shell of the pump when it is unpacked.

  2.If the pump does not have a lifting ring, it must be lifted with hemp rope at the front and rear end caps of the pump or carried by forklift truck.

  2.Installation site:

  Roots vacuum pump should be installed in bright, dust-free and well ventilated buildings.

  The installation environment temperature of Roots vacuum pump is 5-40 C.

  There should be enough room around Roots vacuum pump for routine inspection, maintenance, disassembly and assembly.

  3.Fondation works:

  Roots vacuum pump can be installed on the same rack as the front pump to form a unit and then installed on the concrete foundation. Large pumps can be installed on the cement foundation separately, and the reserved holes of foundation bolts can be watered with concrete.

  According to the weight of Roots vacuum pump and the pressure resistance of foundation, the compressive area and depth of concrete foundation are determined.

  In order to bury foundation bolts in concrete, sufficient voids must be left out according to the location of foundation holes when concrete foundation is poured.

  The base surface must be horizontal.

  4.Installation:

  Wood frame is made according to the position of bottom foot hole of pump or unit. The foundation bolt is fixed on the wooden frame, placed in the reserved hole, and then concrete is poured into the reserved hole, placed for several days, and the wooden frame is removed after concrete hardening.

  The roots vacuum pump is put on the foundation, the level is calibrated with a level meter, the uneven part is hardened with metal gaskets, the foundation bolts are tightened, and the bottom cracks are filled with cement.

  5. Pipeline installation:

  Notes: If welding slag and other foreign matter enter the pump during pipeline installation, Roots pump and front pump will be met.

  Cause serious damage or damage, once similar situation occurs, the pipeline and pump must be strictly cleaned up.

  There are no foreign bodies such as welding slag and impurities in the intake and outlet gas pipelines, which have sufficient channel capacity.

  A flexible hose should be installed in the connecting pipe between the outlet of Roots vacuum pump and the inlet of the front stage pump to reduce the influence of vibration of the front stage pump on the Roots vacuum pump.

  In order to shorten the pre-pumping time, besides connecting the inlet of the front pump with the outlet of Roots vacuum pump, bypass pre-pumping pipes and valves can also be installed in the general system.

  In order to prevent the return of oil or water when the front pump stops (when the front pump adopts water ring vacuum pump), the exhaust valve or check valve should be installed on the inlet pipe of the front pump.

  The connection flange of the pipeline is sealed with O-type rubber sealing ring and coated with vacuum coke grease. The whole vacuum system must be sealed without leakage.

  If the pipeline is too heavy, it must be properly supported. In order to avoid affecting the normal operation of the pump

  Vacuum pumps equipped with cooling water shall be equipped with adjusting valves on the pipes at the cooling water inlet in order to control the amount of water.

  6. Installation of electrical equipment:

  Roots vacuum pump can only work within the prescribed inlet pressure range. When the current stage pump stops working, Roots vacuum pump must stop working at the same time. Therefore, electrical equipment must have interlocking and necessary automatic overload and overheating protection devices.

  The wiring of the motor must make the steering of the pump in the direction indicated by the arrow.

  Small pumps can start directly. Large pumps should be equipped with starters, such as pressure-reducing starter.


国产麻豆成人精品av| 人善交VIDEO另类HD| 亚洲av无码a片在线观看蜜桃| 日产乱码一二三区别免费| 日本va欧美va欧美va精品| 亚洲色成人网站WWW在线观看| 色综合久久中文字幕无码| 久久99精品国产99久久| 性色欲网站人妻丰满中文久久不卡| 精品国产一区二区三区四区色欲| 亚洲国产精品久久一线不卡 | 亚洲日韩乱码一区二区三区四区| 又硬又粗又长又爽免费看| 国产产无码乱码精品久久鸭| 国产精品99久久av色婷婷综合| 福利一区二区三区视频在线观看 | 少妇脱了内裤让我添| 小蓝视频在线播放观看| 农村嫖妓CHINESE城中村| 欧美bbbwbbwbbwbbw| 欧美疯狂xxxxbbbb喷潮| 丰满少妇潮喷18p| 亚洲综合无码一区二区三区| 国内少妇人妻偷人精品XXX| 十二寡妇肉床艳史完整版| 成人A毛片免费全部播放| 无码人妻精品一区二区三区久久久| 一本加勒比HEZYO无码人妻| 国产免费内射又粗又爽密桃视频| 亚洲乱码国产乱码精品精| 三男一女做2爱a片免费视频| 日本熟妇人妻xxxx| 久久亚洲AV午夜福利精品一区| 人妻少妇69式99偷拍| 性的暴行中文完整版| 蜜桃人妻无码av天堂三区| 最近在线观看免费完整版高清电影| 亚洲GV猛男GV无码男同网站| 伊人久久大香线蕉亚洲五月天| 亚洲永久精品ww47| 日本丰满护士爆乳XXXX无遮挡 |